Hello,
most C&H structures which are being posted on TV are nonsense because of their invalid time-frames.
To be a true cup & handle pattern it should achieve the requirements stated below(and more if you follow the link)
Cup duration: From 7 to 65 weeks
Handle duration: 1 week minimum with no maximum.
thepatternsite.com/cup.html
This one looks promising and the breakout has just started.
Trade safe
Nik
most C&H structures which are being posted on TV are nonsense because of their invalid time-frames.
To be a true cup & handle pattern it should achieve the requirements stated below(and more if you follow the link)
Cup duration: From 7 to 65 weeks
Handle duration: 1 week minimum with no maximum.
thepatternsite.com/cup.html
This one looks promising and the breakout has just started.
Trade safe
Nik