wardrihano

XRP-USDT Critical Path

BITTREX:XRPUSDT   XRP / Tether
- Currently flirting with the support at 0.78.

- Soon we'll go through the critical green circle.

- The triangle could also turn into a bearish Cypher Pattern falling through next support and uptrend main support line. Especially, if BTC falls to 5-6k range. Then, be prepared to downfall to 0.38 - 0.42 range.

Thanks as always for the reviews, comments, likes, and follows.



** This analysis is used for educational purposes only.**
Comment: Negative News: China crackdown on crypto industry and initial coin offerings (ICOs) and ban of related websites.

If this goes on, expect an even more dramatic downfall.

I will update and re-chart in the next hours.
Comment: Cointelegraph: Ban Complete: China Blocks Foreign Crypto Exchanges To Counter ‘Financial Risks’.

Ups... reassess strategy.
Comment: Fighting its way down the great wall of 0.78 and actually just breached it while writing this comment. If it doesn't bounce back shortly, downtrend will continue to fib retracement 1.272 (0.4x) of current wave.
Comment: BTC fell below 7k, and boom - here we are at 0.64xx. A possible short-term reversal at fib retracement 1.272 (around 0.60xx) is highly likely.
Comment: Now dealing with the strong resistance at 0.78 which was previously support. If it fails to break it, it will fall to the next support level and try to bounce from there.
EN English
EN English (UK)
EN English (IN)
DE Deutsch
FR Français
ES Español
IT Italiano
PL Polski
SV Svenska
TR Türkçe
RU Русский
PT Português
ID Bahasa Indonesia
MS Bahasa Melayu
TH ภาษาไทย
VI Tiếng Việt
JA 日本語
KO 한국어
ZH 简体中文
ZH 繁體中文
AR العربية
HE עברית
Home Stock Screener Forex Screener Crypto Screener Economic Calendar How It Works Chart Features House Rules Moderators Website & Broker Solutions Widgets Stock Charting Library Feature Request Blog & News FAQ Help & Wiki Twitter
Profile Profile Settings Account and Billing My Support Tickets Contact Support Ideas Published Followers Following Private Messages Chat Sign Out