HTF BIAS---> SUPPLY TAP IN daily and 4h
followed by 1H liquidity grab
checking of schematics on 45/30/15/5 min timeframes.
Entry at 5 min IC because of distribution schematics
15 min to 30 min Supply zone with validity of area.
wyckoff schematics starting from 1h down to 5min .
Another Clear Wyckoff Schematics (SEEN ON 4h TF ----> Confirmation on lower timeframe
1h order flow down to 5min tf.
After proof of validity, entry at next mitigation of institutional candle.
(CHECK CHARTS FOR LABEL.
RR: 1:17