I see 2 major options now:
1. An irregular is going to be built in wave 2.
2. Wave 2 has already been built.
I see wave 1 from April, 1 to April 25 as finished.
In D1 chart it looks like this
cdn1.imggmi.com/uplo...ad2f45fcc2f-full.png upload pics
1. An irregular is going to be built in wave 2.
2. Wave 2 has already been built.
I see wave 1 from April, 1 to April 25 as finished.
In D1 chart it looks like this
cdn1.imggmi.com/uplo...ad2f45fcc2f-full.png upload pics