NWT. Drill hole GTCM21 -16 intersected 5.07 g/t over 8.35 metres including 11.87 g/t gold over 3.08 metres in a strongly strained and sericitized portion of the Campbell Shear.
About Gold Terra's Yellowknife City Gold Project The YCG project encompasses 800 sq. km of contiguous land immediately north, south and east of the City of Yellowknife in the Northwest Territories. Through a series of acquisitions, Gold Terra controls one of the six major high-grade gold camps in Canada. Being within 10 kilometres of the City of Yellowknife, the...
Gold Terra - waiting Drill result 2020 - H4
Gold Terra - waiting Drill result 2020 - November Daily
In this Phase 1 drilling program, the Company has completed 10 holes totaling 5,743 metres to test the depth extension of the Crestaurum deposit All four holes intersected the Crestaurum shear with mixed results. The best intersection was 6.81 g/t over 1.4 metres in hole GTCR20-092. These four widely spaced holes (approx. 150 metres) tested a strike length of...
rien de nouveau, on attend un nouveau point d'entrée. on devine que les résultat du forage vont être très retardées comme toutes les compagnie (covid).
I think result (Drill) is delayed by one week.
Waiting Drill result 2020 last chance to enter before pump. Drill result in 2 or 3 week.